Page 169 - CW E-Magazine (5-8-2025)
P. 169

Special Report                                                                 Special Report



 a few subsidiaries with annual capacity   Table 4: Russian exports of scandium & certain scandium compounds to US  pressure acid leach (HPAL) and solvent   Table 5: Red mud generation in Indian bauxite refi neries (mtpa)
 about 20-tpa of oxides.  Scandium metal  Scandium compounds  extraction (SX) techniques. It will pro-  Company  Location  Red mud generation
    Qty. (kg)   Value (US$)   Exports to   Qty. (kg)  Value   duce  37-tpa  of  oxides.  The  project is   Nalco  Damanjodi, Odisha   3.10
 Taojiang Ruilong Metals New Mate-  awaiting agreements for off take.
 rials is a joint venture of Hunan Metal   US, share   (US$)  Hindalco  Utkal, Odisha                 2.05
 Material Institute and Bloom Energy of   2017  14   199,820   100%  5  14,420   There are two other projects at pre-  Hindalco  Belgavi, Karnataka   0.44
 USA  (the  largest  producer  of  SOFCs).   2018  54   757,800   100%  3  17,131   liminary stage by this company. Similarly   Hindalco  Muri, Jharkhand   0.61
 Capacity of Sc O  is 5-tpa and of Al-Sc   2019  60   819,000   97%  5  32,725   there are many others where only the   Hindalco  Renukoot, Uttar Pradesh   0.97
 3
 2
 alloys 50-tpa.  2020  130   1,746,780   100%  2  52,840   reserves of ores have been confi rmed.  Vedanta  Langigarh, Odisha   2.00
 Guangxi Maoxin  Technology Co.   2021  420   5,557,980   95%  7  179,870   Rio Tinto has reached a binding deal   Total  9.17
 produces  Sc O   from TiO   waste  acid.   Source:  Offi  cial  export  statistics  from  Russia  under  Russian  export  classifi cation  numbers  2805.30.4000   to buy the Platina Scandium Project, a
 2
 3
 2
 It  processes 450-ktpa  of  waste  acid   and 2846.90.3000  high-grade scandium resource in New   Scale-Up  is  developing a  process   Assuming average of 45 ppm of Sc
 with an annual capacity of 3-tpa of high   ride; 1,200-tpa of aluminium-based    The Tomtor Sc-REE-Ta-Nb deposit   South Wales, Australia, from Platina Re-  for Sc-products from red mud. The fi rst  and  extraction  effi  ciency  of  75%,  the
 purity Sc O .  intermediate alloys; and 40,000   is estimated to have 1.18-mt of ore   sources Ltd., for $14-mn. The project has  plant will come up in Greece within the  maximum potential as Sc O  is 474-tpa.
 3
 2
                                                                                              2
                                                                                                3
 cubic meters of vanadium electrolyte   resources, with Sc O  content of   a long life, high-grade scalable resource  Mytilineos alumina plant, processing  Probably half, i.e., 237-tpa may be
 3
 2
 Jiaozuo Rongjia Scandium Industry   annually.  0.048 wt.%;  that could yield up to 40-tpa of Sc O ,  850-ktpa of residue, to produce 67-tpa  reachable, which as 2% master alloy,
                                   2
                                     3
 is connected with Hunan Oriental Scan-    The third phase will include the pro-    The Kumir Sc-U-REE deposit with   for an estimated period of three decades.  of  crude  Sc concentrate.  The concen-  is 11,850-tpa. There is an added advan-
 dium Co., and produces about 30-tpa of   duction of 20,000-tpa of new high-  Sc O  content of up to 0.1 wt.% has   At present, Rio  Tinto generates Sc O   trate  will  be  refi ned  at  ScaVanger into  tage that it would be possible to recover
 2
                                    2
                                      3
 3
 Sc O .  performance aluminium alloy billets   possible Sc resources exceeding   from TiO  processing waste streams at  22-tpa of pure Sc O , which will then  vanadium and neodymium, as well.
 3
 2
                                                         3
                                                       2
              2
 containing scandium and 20,000-tpa   100-tonnes;  Sorel-Tracy in Quebec, Canada, with a  be returned to Mytilineos’  Al smelter
 MCC Ramu New Energy Technology   of aluminium alloy profi les.     The Kovdor deposit, considered   nameplate capacity of 3-tpa.  for production of 733-tpa of Al-Sc 2%   There is an inter-institutional R&D
 Co. is a producer of nickel and cobalt.   a large source of Sc in Russia, is   master alloy.   project with aluminium industry partici-
 Scandium is recovered from the solid  Russia  estimated at 420-tonnes at 0.078 wt.%   Europe  pation at CSIR-Institute of Minerals
 waste of the process. These ores contain   Scandium production in the former   of Sc O , which would secure annual   Europe has two sources of Scan-  Other alumina producers in EU  and Materials  Technology (IMMT)
 3
 2
 about 300-ppm of scandium. The capa-  Soviet Union began in the Cold War, spe-  Sc O  production of up to 8-tpa.  dium – from TiO  waste acids and from  are  AOS Stade (Germany), LARCO  (Bhubaneswar), which is at pilot plant
                    2
 3
 2
 city is 20-tpa of Sc O .  cifi cally at the Nova Mine, near the town   alumina red mud. EU has funded two  (Greece), ALUM (Romania) and MAL  stage. In contrast, the EU Scale-Up pro-
 3
 2
 of Zhovti Vody, in Ukraine. The Nova   Rusal has announced a pilot facility   projects totalling ~€ 9-mn, which have  (Hungary).  ject, which is very similar, has reached
 Hunan Kunwell Advanced Material  mine was a deep (1,000 meters) under-  for the production of 1,550 kg of Sc O    reached a stage where within 3-4 years   a stage where a commercial lot may be
 3
 2
 Co. Ltd. has a capacity of 2-tpa of crude  ground polymetallic resource, primarily  per year, at its Bogoslovsky Aluminium   the  fl owsheet  can  be  commercialized.   The EU scandium market is fore-  delivered by 2027.
 oxides.  iron ore, but also containing scandium,  Smelter. The facility is scheduled to be   The two consortium-based projects,  cast to increase from 25-tonnes Sc O
                                                                       3
                                                                     2
 uranium and other radioactive minerals.  commissioned by the end of 2025. The   named  Scavenger and  Scaleup, are  in 2020 to 350-tonnes in 2026 and   The author believes that enough
 The total Chinese capacity of Sc O   The scandium resource was estimated to  investment in the project is approxi-  based on TiO  and red mud respectively.  1,100-tonnes in 2031.  Today, the EU  R&D has been done and a semi-com-
                 2
 2
 3
 may of the order of 90-100 tpa, exclud-  be 7.9-mt grading  105 ppm scandium,  mately 500-mn roubles. Production will   The goal of the EU is to reach strategic  imports 100% of its requirement, mainly  mercial scale plant to produce 1-tpa of
 ing production from Bayan Obo tailings  and the mine was believed to be the only  be eventually scaled up to 19-tpa of   independence with competitive prices.  from China (~67% share of total  Sc O  should be a priority in India.
                                                                            2
                                                                              3
 as scandium recovery is part of REE  primary scandium mine in operation in  Sc O .  imports).
 2
 3
 plants for which details are not available.  the world. The Sc O  from this source   European TiO  pigment plants have   In March 2025, MTM Critical Metals
                     2
 2
 3
 was used to make lightweight, high  Australia  a total capacity of about 1.50-mtpa. Of  India  signed a non-binding MoU with
 In October 2024, China commenced  performance Al-Mg-Li-Sc materials for   About 19 Australian companies have   this, approximately 0.5-mtpa is produced   India has possible two sources of  Vedanta Ltd., a global giant in aluminium
 construction of a Scandium-Vanadium  MIG fi ghter jets. During this time, the  announced plan for scandium produc-  via the chloride process.  ScaVanger  scandium: waste acid from  TiO  pro-  production, to explore use of their pro-
                                                                   2
 New Materials Industrial Park, with a  knowhow on scandium was tightly held  tion based on nickel-bearing ores, but   will use iron chloride rich solutions  duction; and red mud from alumina  prietary, patented Flash Joule Heating
 total investment of CNY 1.08-bn, in  as a proprietary military secret.  production is at least 5-10 years away.  from TiO  production mainly from high  production.  (FJH) Technology  to  recycle Vedanta’s
              2
 three phases.   grade TiO   feedstock as  the  scandium                  red mud and recover valuable metals, in-
               2
   The fi rst phase targets production of   Today, except for Rusal, an alumi-  This is illustrated by the Nyngan   content of waste acid would be 60-140   As per the Jawaharlal Nehru Alu-  cluding iron, alumina, titanium, gallium,
 2,500-tpa of vanadium pentoxide,  nium producer, in Russia the recovery  scandium project owned by Scandium   mg/l. The fi rst ScaVanger plant will be  minium  Research  Development  and  scandium, rare earths that are locked up
 60,000 cubic meters of vanadium  of scandium is from uranium residues.  International Mining Corp in New   operated at Tronox, a TiO  producer. It  Design Centre (JNARDDC), India  by the iron.
                            2
 electrolyte  (needed  for  fl ow  batte-  The Dalmatovskoye uranium deposit is  South  Wales,  which  could  be  the  fi rst   can be adapted to other chlorine  TiO 2   produces  about  9.17-mt  of  red  mud.
 ries for bulk electricity storage), and  probably the only  operating scandium  project to on stream.  The separation   production sites later on. This plant will  The REE content ranges (in ppm) bet-  As already mentioned EU has paid
 50-tpa of scandium fl uoride by 2027.  recovery plant. But there are three other  and refi ning plant fl ow sheet was vali-  be able to supply about 21-tpa of Sc O ,  ween: Sc 30-65, La 20-65, Ce 45-105,  attention to the availability of scandium
                                   2
                                     3
   The second phase will expand pro-  deposits – Tomtor, Koydor and Kurmi –  dated by considerable bench scale/small   which represents about two-third of the  Pr 4.9-6.6, Nd 15-30, Y 4-10, and Gd  in waste acids of  TiO  production.
                                                                                               2
 duction by: 50-tpa of scandium fl uo-  that are being actively pursued.  pilot scale tests. The process uses high   expected EU consumption in 2028.  4-8 ppm.  India’s TiO  production capacity is about
                                                                                   2
 168  Chemical Weekly  August 5, 2025  Chemical Weekly  August 5, 2025                                 169
                                      Contents    Index to Advertisers    Index to Products Advertised
   164   165   166   167   168   169   170   171   172   173   174