       83,000-tpa. Some new projects are also  Pricing                    350-tpa in 2026 and 1,100-tpa in 2031.
       underway. KMML is the only producer   Scandium is an expensive material.  This  equals  to  55,000-tonnes  of  2%
       using the chloride route (all others use the  The  price  is  mostly  quoted  on  basis  of  Sc-Al master alloy. But the feasibility of
       sulphate route). Assuming that 8-10 tonnes  the oxide and its purity. Scandium metal  such volumes needs to be verifi ed.
       of acid is generated per tonne of TiO  by  as such has very small uses. Recent prices
                                   2
       sulphate route, containing 10-25 mg/litre  (per kg) in China (as of April/May 2025)   Bloom Energy, the largest producer of
       Sc O , the potential is 580-600 kg/year.  are as follows:          SOFCs, has a stated capacity of 1 GW per
          3
         2
       With KMML’s capacity at 40,000-tpa and    Sc O  99.9% - $658.     year or 10,000 modules of 100-kW each.
                                             2
                                               3
       the waste acid containing 60-140 mg/litre    Sc O  99.99% - $746.  A 2020 report indicated that each module
                                               3
                                             2
       of oxides, the Sc O  potential is about    Scandium metal 99.9% - $313,879.  may have 13-15 kg of Sc O . Thus  the
                     2
                       3
                                                                                               2
                                                                                                 3
       1,200 kg/yr.  The technology to recover    Scandium metal 99.999% - $522,223.  demand for oxide would be around 130-150
       Sc from acid wastes is based on solvent    Scandium alum alloy 2% - $30.70.  tpa by Bloom Energy alone. But this does
       extraction and ion exchange.                                       not reconcile with numbers put out by the
                                           At these prices it appears viable to pro-  USGS (10-15 tonnes production).
       Others                            duce Sc O  from TiO  waste acid (as in
                                                         2
                                                 3
                                               2
          Ukraine has U-Fe deposits in its  China); from Nickel production sources   Reconciliation of demand-supply is
       Nova mines.  The scandium resource  (as in Philippines) and alumina red mud  rendered  diffi  cult  given  the  fragmented
       was estimated to be 7.9-mt, grading 105  (as planned by EU). A project in Australia  nature of information from diverse sourc-
       ppm scandium. Scandium recovery dates  based on nickel ores indicates an estimated  es; information not uniformly dated; and
       since Soviet era and the mines closed in  cost of $557/kg Sc O .   the fact that import-export statistics are
                                                      2
                                                        3
       2002 for various reasons.  Apparently                              of no help (as Sc is combined with other
       many tons of oxides were produced over  Demand-supply trends       REE). Sc O  may be  produced, say,  in
                                                                                    3
                                                                                  2
       a period of time under Russian control.  Current  capacity  for  Sc O   is  about  Philippines,  refi ned  another  country  and
                                                              2
                                                                3
                                         122-tpa, but in the next fi ve years, the ex-  the product produced in third country and
          In Kazakhstan most information was  pected additional capacity is 356-tpa. Thus  shipped to the fi nal user in fourth.
       classifi ed,  and  declassifi cation  has  been  it may be expected that worldwide total
       done partially. Scandium is produced  could rise to between 480-tpa to 520-tpa –  CONCLUSION
       from uranium tailings, and a pilot project  a very big leap and that will shake up the   Scandium appears to be a rare earth that
       was started in 2013-14 and was slated to  world of aluminium metal products. The  is available from many sources worldwide.
       produce 5-tpa of oxides.          prediction of future production however is  Although the concentration are low in the
                                         fraught with many caveats.       resources, it is still viable to extract it.
          Sumitomo  Phillipines  produces
       Sc O  from nickel-cobalt operations.   The EU Sc market is forecast to in-  Major resources like  TiO  waste
           3
                                                                                                   2
         2
       Production capacity is ~7.5-tpa and is  crease from 25-tpa Sc O  in 2020 to  acids and red mud from alumina production
                                                           2
                                                             3
       mostly exported to USA.                                            are available in many countries, includ-
                                           Table 6: Production capacity of   ing Europe, USA, India, Russia, China,
          Rio Tinto Canada has started trial pro-  Sc O  [tpa]            etc.  Technology for recovery from  TiO
                                             3
                                           2
                                                                                                         2
       duction capacity of 3-tpa of Sc O  to be        Current  Expected   waste acid is well established in China.
                               2
                                 3
       ramped up gradually. Scandium Canada           capacity  addition  Technology developments from red mud
       Ltd. is another mine development project   China    100      100   are at take-off  stage in Europe. The extrac-
       in Crater Lake area in Quebec.    Philippines       7.5            tion of ores and tailings is at level which
                                         Russia            1.5       19   requires large investments at the stage of
          In USA, Niocorp Developments   Canada              3            mining and production. The conversion of
       Ltd.’s Elk Creek project is awaiting fur-  Kazakhstan  5           oxide to Al-Sc master alloy is commercial
       ther funding. The estimated potential is   Others     5            in  China.  Other countries  need  surge  in
       11,337-tonnes of Sc O  besides other                               R&D eff orts.
                         3
                        2
       rare earths over a 30-year period.  Europe                    43
                                         Australia                   77   For further reading
          PT  Vale Indonesia, a large nickel   USA                  100      Rare earths: Applications and market
       producer, has indicated plans to recover   Indonesia          17   scenario,  Chemical Weekly, October 19,
       scandium.                         Total             122      356   2021.
       170                                                                     Chemical Weekly  August 5, 2025
                                      Contents    Index to Advertisers    Index to Products Advertised
   165   166   167   168   169   170   171   172   173   174   175