Page 171 - CW E-Magazine (29-7-2025)
P. 171

Special Report                                                                   Special Report


 Monitoring cathodic protection (CP)   be diffi  cult in the case of a complex   There  are some points that  should   in areas where different soil resisti-
 system by using Coupons  piping network where a large num-  be taken into consideration when pur-  vity, soil chemistry, moisture content,
 A CP Coupon is a piece of bare   ber of current sources are operating  chasing or designing a CP Coupon:  current density, coating conditions
 metal that should be manufactured   and must be interrupted  simulta-     The  associated  fi tting  and  soil   and temperature are expected to be
 from the same material as the structure   neously. In this case CP Coupons can   access tube (if used) should be made   found. An example of these locations
 under test. The Coupon is buried in the   be momentarily disconnected from   of non-metallic materials.  is on top of a dry rocky hill, a low
 same electrolyte near the structure to be   the structure and its instant discon-     The diameter of the soil access tube   wet valley, mid-span between CP
 tested and connected to it through a test   nect potential  measurement  com-  should be large enough to allow the   current sources, and at suction & dis-
 station. This allows the Coupon to be   pared to relevant standards in order   placement  of  a common reference   charge points of compressor stations.
 connected to the structure’s CP system   to assess its CP status. Moreover, if   electrode  like the ones in the   CP Coupons should be installed in
 and to be polarised in a similar manner   the 100-mV shift polarisation crite-  market.  each of these locations in order to
 as the structure.  rion is adopted, and there is a need   The lead wires should be terminated   assess the effectiveness of impressed

 to obtain the rest potential or native   in an accessible test station to have   current CP system for each of these
 Coupons have been used since the   potential of a Coupon, then the CP   easy access to them. In addition, the   areas.
 1930s in North  America and Europe   Coupons can be disconnected for a   test station should be equipped with
 by corrosion pioneers and are a proven   longer period of time, thus allowing   a disconnect switch or  a similar   How to install corrosion Coupons:
 way to determine the polarisation level   it to depolarise completely. This can   feature in order to allow rapid dis-  In order to acquire meaningful
 of a structure and to determine the insu-  be easily done without the need to   connection of the Coupon from the   readings a Coupon must have a good
 lation resistance (IR) drop error that is   disconnect the CP system for an   structure.  electrical  contact between itself and
 always associated with the structure to   extended period of time.     The Coupon materials  should be   the surrounding environment.  This is
 soil potential measurement(4).     The  presence  of  foreign  rectifi er   of the same material or alloy as the   accomplished  by compacting  the soil
 units  can’t  be  interrupted  or  their   structure under test. This will allow   around the Coupon to remove any air              Fig. 6: Direct reading ultrasonic thickness gauge/meter
 Why Coupons are used to measure a   location  is unknown, resulting in   it  to have  the same  polarisation   voids  that will degrade the electrical   According to NACE SP0104-2014,  the pipeline and initiation of cracks
 structure’s polarisation level?  an IR error that will be present in   behaviour  as the structure  and to   connection  between the Coupon and  it is recommended that the lateral dis-  or flaws and other pipeline flaws or
 In structure to electrolyte potential   instant off -potential measurements.  have meaningful data from the CP   the surrounding environment.  Several  tance  between the Coupon and the  defects. Figure-6 shows a very handy
 measurement,  an inevitable  error is   The presence of directly connected   Coupon potential readings.  methods are available  for Coupon  pipeline  shall range from 10-30 cm  portable ultrasonic thickness gauge.

 always introduced, which is known as   sacrifi cial anodes can’t be interrup-     The size of the Coupon should be   installation, including:  and shall be installed in the lower half  An ultrasonic transducer (piezoelec-
 the IR drop error. This error depends on   ted, resulting in an IR error in off -  chosen based on the largest holi-     Excavation  activities  during  of  the  pipe  (between  3  o’clock  and  9  tric crystal) is used to transmit ultra-
 several factors such as burial depth, soil   potential measurements.  day size expected on the structure   structure investigation;  o’clock positions) (5).  sonic wave (signal) into the pipe-
 resistivity, coating conditions  and  the   The presence of stray currents might   under test. Commercially available      Auguring;  line  section under test.  The  signal

 presence of stray currents. To eliminate   aff ect off -potential measurements.  Coupon sizes range from 650 mm       Vacuum excavation;  Ultrasonic crack inspection  travels through the thickness of the
 2
 this error, the instant off -potential mea-     Rapid  IR spikes that  immediately   to 10,000 mm . For bare or poorly      Hand digging; and  Ultrasonic technology uses ultra-  pipe and gets reflected back, which
 2
 surement method has been adopted to   appear after current interruption can   coated  structures, a large Coupon      Installation  of the  Coupon during  sonic sound waves to detect thick-  is received by a receiver. The thick-
 measure the true polarisation potential   aff ect off -potential measurement.  should  be  chosen;  however,  for   the structure’s installation  ness reduction in critical sections of  ness of the pipe is directly digitally
 level of a structure.     Multiple pipelines in the same right-  a well-coated structure  a smaller
 of-way interfere with one another   Coupon size should be selected where
 All  current  sources  aff ecting  the   that make individual measurement   only small holidays are expected.
 structure under test should be interrup-  for each pipeline diffi  cult.     Coupon lead wires should be
 ted synchronously in order to obtain an   securely connected to the Coupon
 accurate instant off -potential measure-  CP Coupon design  such that a low-resistance electrical
 ment.  In  some  cases,  this  is  too  diffi  -  Several types of Coupons are avail-  continuity is maintained throughout
 cult, and it would be easier to assess the  able(4):  the design life.  This can be done
 CP level of the structure using the Cou-     Two wires Coupons.  through silver soldering, exother-
 pons instant disconnect potential. Some   Coupons  with a built-in integral   mic welding, mechanical  connec-

 of the cases where the CP Coupon can   reference electrode.  tion or any other suitable method.
 be used instead of the structure to elec-     Coupons with a stationary electrode   The connection should  be  isolated
 trolyte potential are when:  permanently  buried  near  the  from the electrolyte by encapsulat-
    The structure under test is under the   Coupon.  ing it in a protective coating.
 infl uence of several impressed cur-     Dual Coupons with the same geo-
 rent sources that must be synchro-  metry and size for measuring both  Where to install Coupons:
 nously interrupted together. It may   CP and rest potential.  Coupons should be installed   Fig. 7: Thickness monitoring of  tubes & pipes by ultrasonic gauge (D-meter)


 170  Chemical Weekly  July 29, 2025  Chemical Weekly  July 29, 2025                                   171


                                      Contents    Index to Advertisers    Index to Products Advertised
   166   167   168   169   170   171   172   173   174   175   176