       was initiated to ensure there was no  continuously monitored for leaking  stalled to avoid moisture ingress in sys-
       other place where this material was used.  phosgene.               tem  in case of tube-to-tubesheet joint
                                                                          failure. There is provision of emergency
          “To ensure that always the right   The steam-ammonia curtain is a  push buttons on DCS & fi eld to stop the
       material is used (pipe classes, resis-  secondary safety measure solution  plant in case of any heavy leakage of
       tant material for equipment, gaskets),  which, in Covestro, is installed in  phosgene gas.
       a proper work/equipment quality  selected areas of  a limited number  of
       program must be in place and lived,”  units in phosgene service. The purpose   Several phosgene sniffers have been
       Dr. Lange added.                  of a steam-ammonia curtain  is to  installed – 16 in phosgene plant, 25 in
                                         effectively reduce any impact of released  TDI plant, and 8 in outer periphery of
       Secondary containment systems     phosgene – by converting it to carbon  other plants. Besides, 10 carbon mon-
          While the primary safety measures  dioxide and ammonium chloride – and  oxide (CO) and 4 chlorine sniffers are
       at phosgene plants are focused on pre-  stop it from spreading beyond the unit  installed in phosgene plant, in addition
       vention and ensure that, in the very  boundaries.                  to 12 chlorine sniffers in the chlorine-
       rare event of a minor leakage, detect-                             handling area. “Special interlocks have
       able levels of phosgene do not exceed  Measures at GNFC plant      been incorporated to stop the phosgene
       the regulatory limits at the plant or site   Mr. Hemant  Yadav, Manager,  plant in case of actuation of two phos-
       perimeter, secondary measures, which  GNFC Ltd., highlighted  some  of the  gene sniffers at a time,” Mr. Yadav said.
       are  unique to the  phosgene industry,  safety measures taken at GNFC’s
       serve to protect against the highly un-  72-tpd (tonnes per day) phosgene gas   A water curtain sprinkler system has
       likely event of an extensive phosgene  production unit, which has no storage  been installed in all fl oors of phosgene
       leakage.                          or liquefaction  facilities.  The plant is  plant for containment of phosgene gas in
                                         provided with a  direct connection to  case of any leakages or gas released, and
          In the phosgene industry three tech-  emergency scrubber system in case of  a provision is made to operate this water
       nical options are used to limit uninten-  any emergency release, and chlorine  curtain sprinkler system directly from
       ded emissions: containment with caustic  scrubbers. Emergency and vent scrub-  DCS & fi eld, as well as on actuation of
       scrubber; full-jacket  technology;  and  bers are also  provided  in the  toluene  phosgene sniffers of phosgene plant.
       steam-ammonia curtain. These are used  diisocyanate (TDI) plant to cater emer-
       individually or in combination.   gency situation.                    The response checking of phosgene,
                                                                          chlorine, and CO  sniffers,  as  well as
          According to Mr. Joan Codina     Chlorine & phosgene services have  fi re-water sprinkler system are carried
       Jornet, Covestro, Spain, the choice of  tongue  &  groove  type  fl ange  joint  &  out periodically.
       measure is dependent, amongst other  higher schedule piping with 100%
       factors, on  the size of  the plant, the  radiography tested joints of pipelines   GNFC also has its  own Occupa-
       amount of ammonia required for a steam-  for preventing leak. Specially designed,  tional Health Centre with four beds and
       ammonia  curtain and the individual  imported, high-cost Bellow seal globe  three ambulances at Medical Centre
       local circumstances. For new large-scale  type valves are utilised in phosgene &  located  at  plant  site,  in addition to a
       plants, containment with caustic scrubber  chlorine gas carrying pipelines, and  hospital having 32 beds and two ambu-
       is the method most often used and recom-  double tube sheet heat exchangers in-  lances located in the Township.
       mended to limit damage.

          The containment system includes a
       ventilation system,  dedicated leak  de-                  Missed a copy !!!
       tection monitors, and a caustic scrubber     For Digital Edition of this month’s issue & all other past issues
       system for decomposing phosgene.
                                                                 Visit www.hpicindia.com
          Double wall (fully  jacketed)  sys-                 PDF copies available for download
       tems are the preferred secondary safety                      Register Now
       measure for Covestro’s phosgene pro-  Contact: For Subscription   : Mrs. Usha S. - usha@hpicindia.com
       cessing specials units, and the space                   For Advertising   : Mr. Vijay Raghavan - vijay@hpicindia.com
       between inner and outer pipe are


       Chemical Weekly  October 22, 2024                                                               179


                                      Contents    Index to Advertisers    Index to Products Advertised
   174   175   176   177   178   179   180   181   182   183   184