Special Report                                                                   Special Report


 variable  capacity  control  requirement,  heat recovery is installation of additional  leakage from such seal, the material is   EMS-27: While looking for chang-  EMS-31: In many reactions, oxygen  tom  of  any  plant  contains  valuable
 can bring signifi cant energy saving.  bank  of  economiser  to  add  surface  either  contaminated,  vented  or  fl ared.   ing  from  high  pressure  steam  to  low  is  one  of  the  reactants.  Reaction  is  material,  which  cannot  be  recovered
 area for more heat recovery from fl ue  However, due to presence of gas at seal-  pressure  steam  as  energy  source,  it  is  normally at high pressure and tempera-  by simple distillation operation. There
 EMS-18: Steam tracing is provided  gas  and  heat  water/process  stream.  ing surface in many cases, when seal is   observed  that  the  requirement  is  mar-  ture. As a source of oxygen, atmospheric  are many other unit operations, as well
 in  petrochemical  plants  and  refi ne-  Normally,  space  available  in  econo-  once found leaking due to any abnor-  ginally for higher pressure than avail-  air  is  used.  When  process  is  at  high  as  unit  processes,  by  which  lighter
 ries. Due to poor workmanship, use of  miser section is not enough and struc-  mal  operation,  it  is  diffi cult  to  get  it   able low level steam or operating mar-  pressure,  power  consumption  in  such  material from slop can be recovered as
 many  fi ttings,  as  well  as  aging,  many  tural  integrity  does  not  allow  to  add  reset due to the presence of gas and this   gin is reduced leading to probability of  air  compressor  is  very  high.  In  order  liquid/gas  fuel  or  valuable  chemicals.
 leakages  develop,  leading  to  loss  of  one bank. It was be possible to insert  leads  to  losses  and  unsafe  conditions.   upset. In such cases, thermo-compres-  to reduce compression power, as well  Detailed study is worthwhile for value
 energy.  Frequent  repair  is  required  to  one  tube  bank  in  available  blank  slot  Use of pressurised double mechanical   sor is one of the solutions to increase  as to enhance capacity of oxygen sup-  addition and energy recovery.
 maintain  leak-proof  system.  Multiple  between  tubes  and  horizontal  part  seals  for  liquefi ed  gas  with  compati-  steam  pressure  and  reduce  high  pres-  ply, oxygen enrichment of air is accept-
 traps  are  provided  for  steam  tracing.  of  stack,  especially  in  heat  recovery  ble sealing fl uid is a good practice to   sure steam usage.  able practice to reduce specifi c volume   EMS-35:  Industrial  cooling  tower
 Many times, trap malfunction leads to  steam  generator  (HRSG).  Check  in  minimise  leakage  of  hydrocarbons  in   and  thereby,  power  reduction  and  to  is evaporative cooling. Cooling water is
 ineffective tracing or passing of steam.  your case too.  atmosphere and fl are, thereby reducing   EMS-28:  One  of  the  reasons  for  enhance capacity. Caution: Metallurgy  pumped to plant and various exchangers
 Now  electrical  tracings  are  available   energy loss and improving reliability.  continuous  fl are  is  passing  of  minor  of equipment, as well as fl ammability  to cool process stream. Many times, it
 for hazardous areas also. It may be eco-  EMS-22: Air  compressors  take  air   quantity  of  hydrocarbon  from  mul-  of  mixed  reactant,  limits  extent  of  is used to cool circulating contaminated
 nomical to convert from steam tracing  from atmosphere. Temperature and rela-  EMS-25: Many sites have continu-  tiple Class 2 type valves in old design.  oxygen enrichment.  water  or  effl uent  water  stream.  For
 to electrical heat tracing or use electri-  tive humidity (RH) of air varies, lead-  ous fl aring of hydrocarbons. Even after   By  changing  normally  closed  control   such  service,  direct  contact  evapora-
 cal heat tracing from project stage for  ing to variation in load and sometimes  detailed  analysis  as  well  as  profi ling   valve  and  manual  valve  for  pressure   EMS-32:  Convection  bank  of  tive cooler for contaminated or effl uent
 better temperature control and low life  become a bottleneck. Although suction  of  composition,  source  could  not  be   control  and  by  letting  down  to  fl are  furnace getting fouled due to deposits  water  stream  is  a  good  energy  saving
 cycle  cost.  It  is  worth  checking  local  fi lters  are  provided,  there  can  be  fi ne  identifi ed. It may be due to small pass-  header  by  tight  shut  off  valves  will  of soot, refractory or dust results in low  solution.  It  may  reduce  capex  also  as
 conditions of cost of steam and electri-  dirt  particles  passing  through  fi lters,  ing  of  many  valves  and  blowdown   reduce  signifi cant  hydrocarbon  leak-  energy recovery and increase of stack  such evaporative cooling can be modu-
 city, maintenance costs, costs of losses  which  can  deposit  and  foul  impellers  required  for  pressure  control,  resulting   age to fl are.  temperature.  Most  convection  bank  lar and avoid expensive exchanger and
 vs. capital investment.  of air compressor, reducing effi ciency  in continuous fl are. Due to the presence   tubes are fi nned tubes and it is observed  pipeline.
 of the compressor; this may require fre-  of large quantity of nitrogen as purge   EMS-29: Air compressor impellers  that  particulate  matter  deposits  in  fi ns
 EMS-19:  Most  control  room  and  quent  water-wash,  as  well  as  increase  gas, the recovery is not considered. It   get fouled due to fi ne dust deposits. It  cannot  be  cleaned  easily.  Chemical   EMS-36:  Mixture  of  chemicals  is
 building  ACs  are  compression  refri-  in frequency of periodic maintenance.  is possible to recover such continuous   is observed that this reduces effi ciency  cleaning of convection bank from outer  separated  in  a  series  of  columns.  For
 geration. However, after commissioning  Installation of combined fi lter, washer  fl aring of gas and use as a fuel gas. In   signifi cantly. Dust can deposit in inter-  surface is done, but water and chemi-  each  column,  there  is  refl ux  condenser
 of process plant, it is normally observed  and chiller in suction of air compressor  case of nitrogen, the recovered fl are gas   and after-coolers, which further reduces  cal may damage refractory of furnace  and  re-boiler.  Heat  is  supplied  in
 that in many locations, low level energy  will reduce specifi c volume of air and  poses combustion issue. Minimise it by   capacity  and  effi ciency.  This  can  be  or  boiler.  To  avoid  such  damage,  dry  re-boiler  and  removed  in  refl ux  con-
 is either vented to atmosphere in form  dirt  load  for  effi cient,  consistent  and  use of orifi ce or replace purge nitrogen   due to passing or malfunction of suc-  ice  blast  cleaning  of  convection  bank  denser.  Many  times,  the  columns  are
 of  steam/water  vapour,  or  cooled  by  reliable operation, ultimately leading to  by methane, which will be recovered as   tion  fi lters  or  very  dusty  atmosphere  was  tried  and  found  successful.  Blast  combined  and  intermediate  product
 cooling water/air. This is loss of energy.  signifi cant energy conservation.  fuel gas.  or  construction  nearby.  In  order  to  gun can go inside small space between  is  removed  as  side  stream  and  then
 Present  costs  of  Vapour  Absorption   regain effi ciency, online periodic water  tubes  and  can  clean  solid  deposits  fi nished in fi nishing column. In order to
 Machine  (VAM)  can  justify  their  use   EMS-23:  In  many  distillation  col-  EMS-26:  There  are  certain  design   spray  cleaning  of  impellers  is  a  nor-  effectively.  reduce  signifi cant  energy  consumption
 for chilled water generation for an AC  umns  and  vessels,  pressure  control  is  margins  while  designing  every  equip-  mally accepted practice and found very   as  well  as  reduce  MPI,  use  of  divided
 load,  especially  if  heat  is  from  waste  split range type. In case of low pressure,  ment and when an equipment is lined   effective. Caution: Type and location of   EMS-33:  Off-gas  from  many  pro-  wall column is one of the proven techno-
 heat and do not have high cost tag. This  supply the inert gas and when pressure  up  in  process,  requirement  of  utility   spray nozzle is very important to avoid  cesses is used as fuel gas, which con-  logies and can be used in place of multiple
 will save electricity and recover waste  increases, vent gases to fl are header or  condition will be different than design.   imbalance  and  malfunction  during  tains hydrogen. This hydrogen has very  columns, re-boilers and condensers.
 heat.  atmosphere (storage tank provision of  Design operating parameters are main-  online water spray cleaning.  high  calorifi c  value  per  kg,  but  low
 additional  cooler/chiller  on  such  vent  tained  by  control  system,  which  may   calorifi c value per cu.m., as compared   EMS-37:  Any  catalyst  requires
 EMS-20:  When  furnace  or  boiler  stream  can  condense  material  for  its  not  be  energy-effi cient.  For  example,   EMS-30:  Process  compressors  to natural gas. When gas is transported  activation  energy.  Therefore,  feed  is
 is operating at high stack temperature  recovery from which at least fuel value  lower chest pressure of re-boiler, ope-  handling mixed gases and unsaturated  from one location to other, it restricts  preheated  even  if  the  reaction  is  exo-
 and there is no feasibility of recovery of  can be recovered).  ration  of  distillation  column  at  lower   gases are prone for polymerisation and  the  fl ow  due  to  high  pressure  drop,  thermic.  Although  energy  integration
 heat in economiser, it is good practice   pressure,  low  refl ux  temperature,  and   fouling  of  impellers  as  well  as  after-/  especially,  when  hydrogen  is  higher  in catalytic reaction is done by utilising
 to install air preheater or fuel preheater   EMS-24:  Pumping  of  pressurised  low  product  temperature.  It  is  possible   inter-coolers.  This  reduces  effi ciency  than  design.  Recovery  of  hydrogen  waste  heat,  product  heat,  etc.,  energy
 for furnace, utilising fl ue gas to recover  liquefi ed gas, where vapour pressure is  to  replace  high  pressure  steam/high   and  capacity  considerably.  Effi ciency  from  off  gas/fuel  gas  will  be  energy  consumption  is  large  and  sometimes
 waste heat signifi cantly. It will require  more than atmospheric pressure is nor-  temperature  energy  by  low  pressure/  is regained by online periodic fl ushing  effi cient  solution,  especially,  where  require  very  high  level  energy.  It  is
 Induced Draft (ID) fan and draft control  mal  practice  in  industry.  Many  types  low  temperature  steam  at  many  pro-  by high aromatic stabilised oil or use of  required hydrogen for process is gene-  observed that due to technological advan-
 system, as well as Interchanger.  of mechanical seals are tried based on  cesses,  taking  advantage  of  design   chemical dispersant to clean impellers.  rated by electrolysis process.  tage  and  research,  catalysts  requiring
 characteristic of fl uid, toxicity of fl uid  margin  and  design  dirt  factor,  which   In  many  applications,  continuous  oil   lower activation energy are available for
 EMS-21: One more option of stack  and  compatibility  of  fl uid.  In  case  of  results in to signifi cant energy conservation.  spray is also used to avoid fouling.  EMS-34:  Slop  generated  as  a  bot-  many  applications.  During  evaluation,


 178  Chemical Weekly  April 23, 2024  Chemical Weekly  April 23, 2024                                 179


                                      Contents    Index to Advertisers    Index to Products Advertised
   174   175   176   177   178   179   180   181   182   183   184