Page 131 - CW E-Magazine (9-4-2024)
P. 131

Top Stories



 PROJECT MILESTONE
 Adani starts up Mundra copper plant, boosting India’s   100% subsidiary of Agrocel Industries Pvt. Ltd.  AGROCEL

 metal capacity                                                                             INDUSTRIES PVT LTD
           India’s leading manufacturer of Bromine offers
 The Gautam  Adani-led group has  recycles treated wastewater within pro-  India’s per capita copper consump-
 announced  the  start  of  the  fi rst  phase  cesses to reduce waste,” the statement  tion is estimated  around 0.6-kg, com-
 of what will eventually be the world’s  added.  pared to the global average of 3.2-kg.   Bromine, HBr, CaBr , NaBr
 largest single-location copper manufac-  The country’s drive towards clean
 turing plant, at Mundra in Gujarat.  Signifi cant output of by-products  energy, increasing penetration  of EVs   2
 Kutch Copper will produce copper  and a host of associated applications
 Kutch Copper, a subsidiary of the  cathodes and rods, as well as valuable  are expected to double domestic copper   n-Propyl Bromide
 group’s fl agship fi rm, Adani Enterprises  by-products such as gold (25-tpa), silver  demand by 2030.
 Ltd. (AEL), has commissioned the fi rst  (250-tpa), selenium and platinum.
 phase of its $1.2-bn greenfi eld copper   India’s copper production has been   Iso Propyl Bromide
 refi nery  by  dispatching  the  maiden   Additionally, it will produce sul-  unable to  meet demand, and  imports
 batch of  cathodes to  customers.  The  phuric acid  (1.5-mtpa), a key raw  have been consistently on the rise for
 fi rst  phase  has  a  capacity  to  produce  material for manufacturing phosphatic  the  past  fi ve  years.  In  FY23,  India   Phosphorus Tribromide
 0.5-mtpa  of  refi ned  copper,  and  the  fertilisers, detergents, pharmaceuticals,  imported a record 181-kt of  copper,
 full-scale 1-mtpa  capacity is  expected  speciality chemicals, etc. India imports  while exports plummeted  to a low of
 by ready by March 2029, the company  roughly 2-mtpa of sulphuric acid.  The  30-kt. Domestic demand in FY23 was
 said in a statement. Technologies criti-  plant will also have the capacity to  about 750-kt, and is expected to rise to   Phosphorus Oxybromide
 cal to the energy transition like electric  produce 250-ktpa of phosphoric acid.  1.7-mt by 2027.
 vehicles (EVs), charging infrastructure,
 solar photovoltaics (PV),  wind and  Indian copper markets  Forward integration strategy  Ethyl-2-Bromobutyrate
 batteries, all require copper.  Adani’s copper plant comes at a   Kutch Copper is also working
 time when Vedanta Ltd. is seeking to  towards  establishing  Kutch  Copper
 “With Kutch Copper commencing  reopen a long-shuttered 400-ktpa plant  Tubes Ltd. as part of its forward inte-  1-Bromo,3-Chloropropane
 operations, the Adani portfolio of com-  at Tuticorin in Tamil Nadu. The coun-  gration  strategy  to add copper tubes
 panies is not only entering the metals  try’s biggest copper smelter is currently  to its portfolio. These tubes will cater
 sector but also driving India’s  leap  operated by  Hindalco Industries  Ltd.,  to applications in air conditioning and
 towards a sustainable and aatmanirbhar  with a capacity of 0.5-mtpa.  refrigeration.
 (self-reliant) future,” said Mr. Gautam
 Adani, Chairman,  Adani Group,  in a   PROJECT COMMISSIONINGS
 statement.  “Our speed of execution   GAIL to commission its fi rst green hydrogen project
 in this ambitious, super-sized project   in April
 underscores our commitment  to take
 India to  the forefront of  the global   GAIL (India) Ltd. plans to commis-  (PEM)  electrolyser  for  green  hydrogen
 copper sector.”  sion its fi rst green hydrogen project at   production has been imported from
 its Vijaipur complex in Madhya Pradesh   Canada.  It  will  produce  about  4.3-tpd
 “The technology used  by  Kutch   in April, as per reports in the media. The   (tonnes per day) of hydrogen, with a
 Copper is engineered to have the lowest   10-MW proton exchange membrane   purity of 99.999%, using renewable power.
 carbon footprint. One-third of the plant
 area has been designated as green belt   Andhra Sugars begins commercial operations at   Contact us for your requirements:
 space, and 15 per cent of the capital has   salicylic acid plant  Marketing Office:
 been allocated  towards environmental   The Andhra Sugars Ltd., the Kovvur   acid plant with a capacity of 2,640-tpa   B-701-702, 7th Floor, Flexcel Park, 184-87, S.V. Road, Jogeshwari (West), Mumbai - 400 102. Maharashtra, India.
 protection. To minimise the ecological   (Andhra Pradesh) based manufacture   at Tanuku has been successfully com-  Tel: 022-62162800 / 26790871 w Email: info@agrocel.net w Website: www.agrocel.co.in
 impact,  the plant has implemented  a   of sugar, organic and inorganic chemi-  missioned. The plant commenced com-
 zero-liquid  discharge model and uses   cals, has informed that its new salicylic   mercial operations on March 27, 2024.  Works:
          w Greater Rann of Kutch, Near Village Dhordo, Taluka Bhuj, Kutch - 370 510. Gujarat India.
 desalinated water for operations. It also
          w Survey No. 442-443, Near Village Avania, Ghogha Road, Bhavnagar - 364 002. Gujarat, India.
 130  Chemical Weekly  April 9, 2024  Chemical Weekly  April 9, 2024                                   131


                                      Contents    Index to Advertisers    Index to Products Advertised
   126   127   128   129   130   131   132   133   134   135   136