Hydrogen peroxide specialist, Indian Peroxide Ltd. (IPL), a subsidiary of Noida-based industrial conglomerate Nuberg, has announced plans to set up a 400-tpd chlor-alkali plant at its Dahej manufacturing complex in Gujarat.
To be implemented within the Dahej SEZ chemical hub, this backward integration project, based on Japanese process technology, is slated for commissioning by October 2026. The facility has been engineered for scalability up to 800-tpd, the company informed.
IPL operates a 300-tpd hydrogen peroxide facility at the Dahej site, based on a Swedish process technology. The facility produces 35%, 50%, and 60% grades of hydrogen peroxide for industrial and speciality-grade applications, serving leading FMCG majors, pharmaceuticals, electronics, textiles, water treatment, and other industrial sectors. IPL exports its products to over 15 countries.
With the addition of the caustic soda/chlor-alkali plant, IPL is strategically entering the chlor-alkali value chain, achieving deeper backward and forward integration. Hydrogen generated as a by-product will feed into hydrogen peroxide production.
Speaking on the significance of the project, Mr. Amit Tyagi, Managing Director, IPL, said, “At Dahej, we are building an integrated caustic soda and hydrogen platform designed for scale, operational resilience and decarbonisation. The project strengthens IPL’s global competitiveness, enables deeper participation in the clean-energy transition, and positions us to deliver world-class chemical products in a carbon-constrained environment. We see this as a long-term strategic asset-engineered for the decades ahead.”
For project execution, IPL has appointed Nuberg EPC as Project Management Consultant (PMC) and EPC contractor, with end-to-end responsibility for engineering, procurement, construction, and commissioning.


23 December, 2025 15:35:37 IST 

















